Camas has wrapped up its 20-year planning update. On Nov. 16, the City Council approved the ordinances adopting the Our Camas 2045 Comprehensive Plan, the Our Downtown Camas 2045 Subarea Plan, a new Downtown Design Manual and a package of zoning and development code amendments, the city announced (via City of Camas).
The work took more than three and a half years. Along the way the city coordinated with Clark County on countywide planning policies and the environmental impact statement, and the plan serves as Camas' required periodic update under Washington's Growth Management Act. It sets goals and policies for land use, housing, transportation, infrastructure and jobs through 2045.
The numbers behind the plan
According to the city's project page, Camas needs room for 4,226 new housing units and 11,615 new jobs over the next 20 years. The September draft of the plan projects a 2045 population of 37,080 and works the housing allocation out to roughly 211 new homes a year. Its land-capacity analysis found room for about 2,254 more units than the target, and it estimates that about 1,766 of the needed units would serve households earning below 80% of the area median income.
Three ordinances carry the changes: 26-008 adopts the comprehensive plan, 26-009 adopts the downtown subarea plan, and 26-010 amends Titles 17 and 18 of the municipal code. The adopted documents are posted on the city's Engage Camas site. The city's announcement didn't list effective dates or summarize the specific code changes.
What changes downtown
The downtown subarea plan aims to protect the district's historic character while making room for new investment, businesses, housing and public improvements. One of its goals is to encourage a wider range of housing so more people can live downtown.
The new design manual is the tool the city will use to apply zoning and design standards in Downtown Camas. Its standards focus on the space between a building's front and the street, covering items such as awnings, windows, landscaping, fences, seating and lighting. The comprehensive plan also notes that stakeholders flagged height limits as a barrier downtown and calls for parking standards flexible enough to respond to site conditions. Those are policy directions; the adopted code is what sets the actual numbers.
Housing rules and the county picture
The update also had to account for recent state housing laws. House Bill 1110 requires Camas to allow up to two homes per lot wherever single-family housing is allowed, and up to four near a major transit stop or when two of the units are affordable. House Bill 1337 requires allowing up to two accessory dwelling units on residential lots. A December 2025 staff report on an earlier Camas code package, Ordinance 25-025, described allowing two units per lot and two ADUs per residential lot. The city's project page still says Camas currently allows one ADU, so builders should confirm which rules apply to their lot.
Clark County adopted its own 2045 comprehensive plan on Oct. 13. In April, the Clark County Council picked a growth alternative that expands the Camas urban growth area to take in Grove Field Airport. The county's final ordinance denied a request to expand the growth area east of Camas for housing, so no agricultural land was taken out of resource designation there.
Why it matters for Contractors
A comprehensive plan sets direction, but the zoning code is what your permit gets reviewed against, and that code just changed. If you've got a Camas project in design or about to be submitted, especially downtown, pull the adopted design manual and the Title 17 and 18 amendments before you finalize plans, and ask the city's Community Development department (360-817-1568) when the changes take effect and how they treat applications already in the pipeline.
For small infill builders, the bigger story may be the state-driven housing rules. If two homes or two ADUs are allowed on lots that used to take one house, some older parcels may be worth a second look. Confirm the current standards with the city before you price a deal on it.
And with the plan built around roughly 211 new homes a year for two decades, the city is planning for a steady pace of residential growth.