Issues The Feed
Hello Contractor News

Weyerhaeuser yards in Fontana and Santa Clarita will stock Arclin's Firepoint fire-resistant sheathing

Weyerhaeuser will stock Arclin's Firepoint fire-resistant sheathing in Fontana and Santa Clarita. What SoCal builders should know about Chapter 7A and ESR-5116.

A new house with wall framing and sheathing going up. Photo: Kgacs via Wikimedia Commons, CC BY-SA 4.0

Builders and framers working in Southern California's fire zones are about to have an easier time getting their hands on one of the newer fire-resistant sheathing panels. Arclin says Weyerhaeuser will carry its Firepoint structural sheathing at Weyerhaeuser's distribution centers in Fontana and Santa Clarita (via Arclin). The Georgia-based materials company announced the deal on Nov. 23 and called it the next step in building out Firepoint's distribution network across California.

Arclin didn't share pricing, stocking quantities or a start date, and the announcement came from Arclin alone. Weyerhaeuser's own pages for the two yards don't mention Firepoint yet.

Both are established Weyerhaeuser Distribution locations. The Santa Clarita center is at 27027 Weyerhaeuser Way, and the Fontana center is at 17400 Slover Ave., according to the company's location pages. The company says its distribution arm has served dealers since 1921, so for most small crews this won't mean buying straight from Weyerhaeuser. It means your local lumberyard should have a shorter, simpler path to ordering the panels.

Firepoint is a structural wall and roof sheathing panel with an intumescent layer bonded to the face. Intumescent coatings swell and char when they get hot, which insulates the wood behind them and slows how fast fire gets through. Arclin pitches it as a panel that goes up like regular sheathing: the company says it needs no special fasteners, cuts without chipping and stays under 50 pounds so one person can carry it.

The independent paperwork backs up the basics. ICC Evaluation Service report ESR-5116, held by Arclin Surfaces, covers Firepoint 2500, an intumescent, fiberglass-reinforced overlay bonded to 15/32-inch structural plywood. The report lists a Class A flame-spread rating and recognizes the panel as wall and roof sheathing, as a component of fire-resistance-rated construction, and in exterior walls of Type V and some Type I through III buildings. It names 4x8, 4x9 and 4x10 sheets as typical sizes. Arclin's product site also lists an OSB version in 8- and 10-foot lengths, and the release says the 4x10 panel joined the lineup this year to help on taller walls and multifamily jobs with fewer seams.

This is the part that matters most in SoCal. Arclin says Firepoint meets California's wildland-urban interface rules in Chapter 7A of the building code. The ICC-ES report's California supplement, revised in October 2026, allows the panel in exterior wall assemblies of new buildings in state-responsibility Fire Hazard Severity Zones and Wildland-Urban Interface Fire Areas, tied to CBC Section 707A.3 and CRC Section R337.7.3. A separate supplement covers the City of Los Angeles codes. One limit worth knowing: the California supplement says the product hasn't been evaluated against the International Wildland-Urban Interface Code.

The headline performance numbers come from Arclin's own testing. The release says Firepoint beats code by 50% or more in select wall assemblies, based on ASTM E119 testing in a third-party accredited lab. The product site puts that figure at 53% and claims the panel withstands fire up to 90 minutes in assemblies rated for 60. Treat those as manufacturer claims, not code ratings.

Matthew Bruce, Arclin's vice president of sales for downstream products, said in the release that "Southern California is an important market for Firepoint" as builders and communities look for practical ways to make homes more fire resilient, and that the Weyerhaeuser deal helps the company serve building pros across the region.

Why it matters for Contractors

If you build or rebuild in a mapped fire zone anywhere from the Santa Clarita Valley to the Inland Empire, local stock of a Chapter 7A-compliant sheathing can mean fewer special orders and fewer delays. Panels that handle structure and fire protection in one layer may also cut out a step on some wall assemblies, which adds up on a small crew.

Before you write it into a bid, call your dealer about price and lead time, because Arclin gave neither. Pull ESR-5116 and its California supplement and get them in front of your plan checker early, and confirm the exact wall assembly you're building is one of the listed assemblies the report points to. The report also says you still need a wall covering over the panel on exterior walls, so it doesn't replace your siding or stucco, and the structural design still has to follow the IBC or IRC. ICC-ES reports run on renewal cycles, so check you're working from the current version when you submit.