Issues The Feed
Hello Contractor News

New Federal Task Force Takes Aim at Red Tape for Factory-Built Homes

A new federal task force led by HUD and FHFA has 180 days to recommend ways to speed approvals and standardize permitting for factory-built and modular homes.

Washington is putting a new group in charge of clearing the road for factory-built housing. HUD Secretary Scott Turner will co-chair the Task Force on Manufactured Housing Innovation, created by an executive order President Trump signed on Oct. 22 (via HUD).

The order, titled "Decreasing Housing Costs for the American People," pairs HUD with the Federal Housing Finance Agency, whose director is the other co-chair. The secretaries of Agriculture, Commerce and Veterans Affairs are members, and the co-chairs can invite other agencies to join.

The group has 180 days, which puts the deadline around late April 2027, to send the President recommendations, routed through his top economic policy adviser, on making it easier to use modern manufacturing methods for manufactured and other factory-built homes that qualify for federal housing programs.

According to the order, the recommendations are supposed to cover:

  • Common specifications, certifications, inspections and approvals across federal housing and housing-finance programs.
  • Agencies recognizing each other's licenses, certifications, approvals and inspections, so builders aren't doing the same paperwork twice.
  • Cutting federal requirements and duplicate reviews that get in the way of automation, modular construction and standardized production, or that add time and cost.
  • Using federal financing, insurance, guarantees and purchasing to encourage more affordable factory-built homes.
  • Promoting competition while keeping standards for safety, quality, durability and consumer protection.

Member agencies are then told to act on the recommendations within their existing authority.

The most interesting piece for anyone who pulls permits is a directive to look at whether federal grant money could be tied to, or used to encourage, state and local adoption of standardized permitting and licensing for factory-built housing. The task force is also supposed to draft recommendations for Congress.

That builds on an earlier order. Executive Order 14394, signed March 13, told HUD to put out regulatory best practices for state and local governments, including re-examining rules that treat manufactured and modular homes differently because of how they're built rather than on objective building and safety standards.

"For decades, home building has been crippled by regulatory red tape, but the Task Force on Manufactured Housing Innovation can usher in the next generation of housing by modernizing standards and speeding up approvals across government," Turner said in HUD's announcement.

The task force comes about two weeks after HUD released its Next Generation Manufactured Housing Action Plan on Oct. 7, as the HUD Code, the federal construction and safety standard for manufactured homes, marks 50 years.

That plan follows the 21st Century ROAD to Housing Act, which dropped the longstanding requirement that manufactured homes sit on a permanent chassis. HUD says it plans to update energy efficiency standards, write design, foundation, anchoring and installation requirements for chassis-free homes, develop a performance-based code for larger factory-built residential buildings, and put out resources for modular and other off-site manufacturers.

The rest of the Oct. 22 order is aimed at buyers and borrowers more than builders. It lets FHFA direct Fannie Mae and Freddie Mac to pilot proactive cancellation of mortgage insurance on new loans, could expand a program that replaces lender's title insurance with automated title review on some refinances, and directs USDA and VA to lower interest rates on their direct single-family home loans.

Nothing changes on the jobsite yet. The task force produces recommendations, and any new rules or grant conditions would come later.

Why it matters for Contractors

Manufacturers and large production builders will feel this first. But factory-built homes still need a lot of local hands. Someone has to do the site prep, pour the foundation, set and anchor the home, run utilities and handle the finish work.

If HUD follows through on foundation and installation rules for chassis-free homes, small foundation, excavation and finish contractors could see more of that work, and new specs to learn. If the permitting push eventually reaches state and local governments, approvals for factory-built homes could get faster in your area, which matters whether you install them or compete with them.

There's nothing to act on today. Keep an eye out for the task force's recommendations next spring and for HUD's chassis-free installation standards.